Government Project

Rectification of Accidental Black Spot

Client: NH Division PWD, 
             Dehradun

Date: 15 October 2020

Category: Government Project

Authority : Ministry of Road  
                   Transport And 
                   Highways

Location : NH-72, Dehradun

Completion : 22 August 2021

Rectification of Accidental Black Spot of Km106.400 NH-72(New NO-07) In the state of Uttarakhand

  • Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and
    other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.Upto 3 m depth
  • Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc.
  • Dense Graded Bituminous Macadam.
  • Bituminous Concrete
  • Interlocking Concrete Block Pavement.
  • Fitting of Retro- reflectorized Traffic signs & crush barrier. 

For New project

Contact us today!

Main Menu

Call Now